DE
|
e-TWINS |
Verbundvorhaben: e-TWINS ' Ganzheitliche digitale Zwillingstechnologie für das Energiesystem |
BMWi (Bundesministerium für Wirtschaft und Energie) |
1.96 M€ / 1.96 M€ |
Jan 2020 - Dec 2022 |
TU München Windenergie, Hochschule München, ZSW, Mesh Engineering |
EU |
Smart4RES |
Next Generation Modelling and Forecasting of
Variable Renewable Generation for Large-scale Integration in Energy Systems and Markets |
EU Horizon2020 |
4 M€ / 4 M€ |
1 Nov 2019 - 30 Apr 2023 |
Armines, DTU, INESC TEC, EDP, Meteo-France, emsys, DNV GL, Whiffle, Dowel, ICCS, HEDNO, DLR |
DK |
Flexible Energy Denmark |
Flexible Energy Denmark |
Innovation Fund Denmark + Power supply companies |
6.0 M€ / 4.1 M€ |
1 April 2019 - 31 March 2023 |
DTU, Center Denmark, AAU, SDU, AU, EWII, Konstant, Novasol, ENFOR, Eurisco, EMD International, NeoGrid, Aalborg Forsyning, TREFOR, NorthQ, Centrica, Danfoss, Tomorrow, xTel, ABB |
EU |
EoCoE II |
Energy Oriented Center of Excellence : toward exascale for energy |
EU Horizon2020 |
9.2M€ |
1.1.2019-31.12.2021 |
18 teams in 7 countries including Fraunhofer IEE |
DK |
[link] |
IEA Wind Task 36 Phase II Danish Consortium |
EUDP (national Danish funding), J.nr. 64018-0515 |
500k€ / 300k€ |
1 Jan 2019 - 31 Dec 2021 |
DTU, ConWX, ENFOR, DNV, WEPROG, Ea Energianalyse, Energinet |
DE |
ParkCast |
Optimization of minute-scale power forecasts of offshore wind farms using long-range lidar measurements and data assimilation |
BMWi (Bundesministerium für Wirtschaft und Energie) |
1.14M€ / 1.14M€ |
1 Nov 2018 - 31 Oct.2021 |
Stuttgart Wind Energy (SWE) at University of Stuttgart, Center for Solar and Hydrogen Research Baden-Württemberg (ZSW), WEPROG (as subcontractor) |
EU |
EU Sysflex |
Pan-European system with an efficient coordinated use of flexibilities for the integration of a large |
European Comission
(Horizon 2020) |
26 M€ / 20 M€ |
Nov 2017 - Oct 2021 |
AKKA, AST, CNET, Cybernetica, e-distribuzione S.p.A., EDPD, EirGrid PLC, ENERCON, Enoco, Fraunhofer IEE, ESADE, Guardtime, Helen, EURACTIV, Imperial, innogy, INESCTEC, KU Leuven, NCNR, Polskie Sieci Elektroenergetyczne SA, PÖYRY, RSE, SIEMENS, SONI, UTartu, VTT, Uni Kassel, UCD, UPSIDE, VITO |
DE |
gridcast |
Increasing supply reliability by using flexible weather and power forecast models based on stochastic and physical hybrid methods |
German Federal Ministry of Economic Affairs and Energy (BMWi) |
6 M€ / 5.5 M€ |
Apr 2017 – Mar 2021 |
Fraunhofer IWES, German Weather Service, Amprion, TenneT, 50Hertz, TransnetBW, Innogy, Netze BW, EnBW, Enercon |
EU |
InteGrid |
Demonstration of INTElligent grid technologies for renewables INTEgration and INTEractive consumer participation enabling INTEroperable market solutions and INTErconnected stakeholders |
European Commission (Horizon 2020) |
14.5 M€ / 11.3 M€
|
1 Jan 2017 - 30 Jun 2020 |
EDP Distribuição (Coordinator), INESC TEC, EDP CNET, Águas de Portugal, Elektro Ljubljana, Ellevio, KTH, CyberGrid, AIT, GE, DNV GL, SAP, SIM, Univ. Comillas. |
DK |
OffshoreWake |
Large scale offshore wake impact on the Danish power system |
ForskEL (administered by EUDP) |
6.879 MDKK / 6.063 MDKK |
1 May 2017 - 30 Apr 2020 |
DTU Wind Energy, Vattenfall |
NO |
NowWind |
Nowcasting for wind energy production - an integrated modelling approach |
The Research Council of Norway (ENERGIX) |
12 MNOK / 6.3 MNOK
(1.3 / 0.7 M€)
|
2016 - 2019 |
MET Norway, Windsim AS, Vestas Wind Systems AS, TrønderEnergi AS, Kjeller Vindteknikk AS
|
FR |
FOREWER |
Modélisation, prévision et évaluation des risques pour la production d’énergie éolienne |
Agence Nationale de la Recherche (French) |
2160 k€ / 481 k€
|
1 Oct 2014 - 31 Mar 2019 |
Université Paris 7, ENGIE Green, Ecole Polytechnique, EDF, RTE, CNRS |
FR |
meteo*swift |
Development of a short-term wind power forecasting tool based on adaptive multi-agent systems and ensemble weather forecasts |
FEDER EU funding & Occitania French region
|
~1 M€ / ~500 k€ |
Mar 2016 - Mar 2018 |
meteo*swift, National Weather Research Center (part of Météo-France), Toulouse Computer Science Research Institute |
DK |
[link] |
IEA Wind Task 36 Forecasting Danish Consortium |
EUDP (nationally Danish) |
2.72 MDKK / 1.83 MDKK
|
Jan 2016 - Dec 2018 |
DTU Wind Energy, DTU Elektro, DTU Compute, DMI, ENFOR, DNV GL, WEPROG, Vestas, Energinet.dk
|
US |
|
IEA Task on Development & Use of Probabilistic Forecasts for Wind Energy |
Department of Energy USA |
$22,732 |
Sep 2016 - Sep 2017 |
NREL |
DE |
ORKA2 |
Optimierung von Ensembleprognosen regenerativer Einspeisung für den Kürzestfristbereich am Anwendungsbeispiel der Netzsicherheitsrechnungen und der Strombelastbarkeitsprognosen
|
BMWi (Bundesministerium für Wirtschaft und Energie) |
501 k€ / 501 k€ |
Jan 2016 - Dec 2018 |
Deutscher Wetterdienst, energy & meteo systems, 50hertz, avacon
|
US |
WFIP 2 (alternate link) |
Second Wind Forecast Improvement Project |
U.S. Department of Energy |
$17M USD / $17M USD |
1 Oct 2015 - 30 Sep 2018 |
Vaisala, NOAA/ESRL, NOAA/ARL, NOAA/NWS, Argonne National Laboratory, Lawrence Livermore National Laboratory, NREL, PNNL |
EU |
EoCoE |
Energy oriented Centre of Excellence
|
EU Horizon2020 |
~5.5 M€ / ~1.4 M€
|
Oct 2015 – Sep 2018 |
21 teams in 8 countries, lead by Maison de la Simulation, including Fraunhofer IWES |
EU |
IRP Wind |
Integrated EU R&D efforts on wind energy |
EU 7th Framework Programme (Project ID: 609795) |
~ 10 M€ / ~10 M€
|
Mar 2014 – Feb 2018 |
24 European teams (participants of the European Energy Research Alliance (EERA) Joint Programme on Wind Energy) lead by DTU Wind Energy |
DE |
PriME |
Innovative probabilistic methods for energy system technology |
German Federal Ministry of Education and Research (BMBF) |
~1 M€ / ~1 M€ |
Jan 2015 – Dec 2017 |
University Kassel, FH IWES, EnerginetDK, Netze BW |
FR/DK |
HD-RESforecast |
High-dimensional dynamical models for improving renewable energy forecasting at distributed locations |
EDF |
116 k€ / 65 k€
|
Nov 2015 - |
DTU Elektro, EDF |
DE |
VORKAST |
Optimisation of design and operational management for hybrid power plants and energy storage technologies by means of wind and PV power now casting (Optimierung der Auslegung und Betriebsführung von Kombikraftwerken und Speichertechnologien mittels Kürzestfristvorhersagen der Wind- und PV-Leistung) |
Federal Ministry for Economics and Technology |
1 M€ / 1 M€
|
1 Sep 2014 – 31 Oct 2017 |
ZSW - Center for Solar Energy and Hydrogen Research Baden-Württemberg (Project lead)
SWE – Stuttgart Wind Energy @ Institute of Aircraft Design, University of Stuttgart
|
DE |
IMOWEN |
Securely integrating wind farm clusters in the grid |
German Federal Ministry of Economic Affairs and Energy (BMWi) |
~1.6 M€ / ~1.4 M€ |
Aug 2014 – July 2017 |
FH IWES, Avacon, Senvion |
DE |
SMART GRID SOLAR |
|
Bavarian ministry for economy, EU infrastructure fund "Investments for the future" |
10 M€ / 6.3 M€ |
2012 - 2018 |
Bavarian Center for Applied Energy Research (ZAE), 3 Fraunhofer institutes, 9 other partners and WEPROG |
PT |
P1 |
Renewable Energy Dispatch Tools |
China Electric Power Research Institute (CEPRI); State Grid Corporation of China (SGCC) |
2 M€ / - |
1 Jul 2013 - 31 Dec 2016 |
R&D NESTER (PT), REN (PT), CEPRI (CN) |
DK
|
X-WiWa |
Extreme winds and waves for offshore turbines |
ForskEL (PSO) |
5.96 MDKK / 5.4 MDKK |
1 Jun 2013 - 2017 |
DTU Wind Energy, DHI, Uni Research, Bergen University |
DE |
EWeLiNE |
Erstellung innovativer Wetter- und Leistungsprognosemodelle für die Netzintegration wetterabhängiger Energieträger |
Bundesministerium für Wirtschaft und Energie |
7.06 M€ / 6.5 M€ |
Dec 2012 - Feb 2017 |
Fraunhofer IWES, DWD, Amprion, TenneT, 50Hertz |
DE |
PerduS |
Photovoltaikertragsreduktion durch Saharastaub |
BMWi (Bundesministerium für Wirtschaft und Energie) |
962 k€ / 962 k€ |
Nov 2012 - Feb 2017 |
Deutscher Wetterdienst, KIT, meteocontrol |
EU |
SafeWind |
Multi-scale data assimilation, advanced wind modeling and forecasting with emphasis to extreme weather situations for a secure large-scale wind power integration |
EU 7th Framework Programme (FP7-ENERGY, Project ID: 213740) |
5.6 M€ / 3.98 M€ |
1 Sep 2008 - 31 Aug 2012 |
Armines, DTU, Risø, Uni Oldenburg, ENFOR, Overspeed, CENER, Energinet.dk and 13 other partners including TERI (IN) and CSIRO (AU) |
DK |
DEWEPS |
Development and Evaluation of a new wind profile theory with an Ensemble Prediction System |
Danish PSO Fund |
480 k€ / 180 k€ |
1 Apr 2009 - 31 Dec 2011 |
WEPROG |
EU |
ANEMOS.plus |
Advanced Tools for the Management of Electricity Grids with Large-Scale Wind Generation |
EU 6th Framework Programme (Project ID: 38692) |
5.7 M€ / 2.6 M€ |
1 Jan 2008 - 30 Jun 2011 |
Armines, DTU, Risø, ENFOR, Overspeed, CENER, INESC, and 14 other partners |
DE |
RAVE |
Research at Alpha Ventus - Grid Integration of offshore wind farms |
BMU, German ministry for the Environment |
5 M€ (60-80% funded) |
2008 - 2011 |
Fraunhofer IWES, Forwind - University Oldenburg, Deutscher Wetterdienst, WEPROG |
DK |
HREnsembleHR |
High-resolution Ensemble for Horns Reef |
Danish PSO Fund (Contract No. 2006-1-6387) |
700 k€ / 400 k€ |
1 Apr 2006 - 31 Dec 2009 |
WEPROG, DTU IMM, DTU Risø, Fraunhofer IWES, DONG Energy, Vattenfall |
EU |
POW'WOW |
Prediction of Waves, Wakes and Offshore Wind |
EU 6th Framework Programme (Project ID 19898) |
1.05 M€ / 1.05 M€ |
1 Oct 2005 - 30 Mar 2009 |
Risø, DTU, Armines, CENER, Uni Oldenburg, Fraunhofer IWES, and 8 other partners including UFPE (BR) |
EU |
HONEYMOON |
A High resOlution Numerical wind EnergY Model for On- and Offshore forecasting using eNsemble predictions |
EU FP5-EESD (Project ID: ENK5-CT-2002-00606) |
1.25 M€ / 892 k€ |
1 Jan 2003 - 31 Dec 2004 |
University College Cork, DMI, E.On, Espace Eolien Developpement, EWE, I/S Eltra, INM, PowerGen Renewables, Uni Oldenburg |
EU |
ANEMOS |
Development of a next generation wind resource forecasting system for the large-scale integration of onshore and offshore wind farms |
EU 5th Framework Programme (Project ID: ENK5-CT-2002-00665) |
4.3 M€ / 2.5 M€ |
1 Oct 2002 - 30 Sep 2006 |
Armines, DTU, Uni Oldenburg, CENER, IASA, and 16 others from TSOs to meteorologists |
DK |
ForbedrVKF |
Improved wind power prediction in connection with stochastic optimization of electricity systems
|
PSO ForskEL 5766
|
119 k€ / 108 k€ |
1 Jul 2005 - 31 Dec 2006
|
DTU IMM, Risø, Energinet.dk, DONG Energy |
DK |
PSO-Ensemble |
Wind power prediction by ensemble forecasting
|
PSO ForskEL FU2101 |
684 k€ / 406 k€
|
1 Jun 2002 - 30 Jun 2005 |
Risø, DTU IMM, DMI, E2, SEAS, Elsam |
EU |
CleverFarm |
Advanced management and surveillance of wind farms |
European Commission, ERK-CT-1999-00006 |
833 k€ / 488 k€ |
1 Apr 2000 - 30 Sep 2003 |
Risø, RES, DMI, University of Oldenburg, SEAS, ISET, Gram & Juhl
|
DK |
|
Vindmøllepark Produktionsprediktor |
EFP99 - Jnr 1363/99-0017
|
767 k€ / 701 k€
|
1999 - 2002 |
Risø, DTU IMM, SEAS, Elkraft System, ELSAM, Eltra, E2
|
EU |
Short-DE |
Short-term prediction of regional wind power production
|
European Commission, JOR3-CT98-0272
|
|
1 July 1998 - 31 Dec 1999 |
Risø, Uni Oldenburg, FH Magdeburg
|
EU |
|
Implementing short term prediction at utilities |
European Commission, JOR3-CT95-0008 |
|
1 Jan 1996 - 31 Dec 1998
|
Risø, DMI, DTU IMM, Elkraft Power Company, Jysk-Fynske Elsamarbejde, National Observatory of Athens |
EU |
|
Short term prediction of local wind conditions
|
European Commission, JOUR-0091-MB(C) |
|
1 Sept 1990 - 31 May 1993
|
Risø, DMI, Rutherford Appleton Laboratories |